川消消防泵使用之前需要進(jìn)行調(diào)試工作
來源:http://m.xintli.net/ 日期:2022-05-06
幾乎大部分的機(jī)械設(shè)備在使用之前都是需要進(jìn)行調(diào)試的,只有這樣才能知道該設(shè)備是不是能夠進(jìn)行下面的作業(yè),消防泵也是如此,那么它的調(diào)試工作是怎樣的呢?
Almost most of the mechanical equipment is needed to be debugged before use, only in this way can we know whether the equipment can carry out the following operations, fire pump is the same, so what is the debugging of it?
消防泵在運(yùn)行前應(yīng)注意調(diào)試,主要是使各方面的數(shù)值滿足相關(guān)要求,并確保其能正常使用且無異常。調(diào)試過程中,有時(shí)會(huì)出現(xiàn)壓力達(dá)不到規(guī)定要求的情況,所以此時(shí)需要考慮造成這種情況的原因很可能是電機(jī)逆轉(zhuǎn)造成的,找到原因就要對癥下藥。
Fire pump should pay attention to debugging before operation, mainly to make all aspects of the value to meet the relevant requirements, and ensure that it can be used normally and no abnormality. In the process of debugging, sometimes the pressure can not meet the requirements of the situation, so at this time we need to consider the cause of this situation is likely to be caused by the reversal of the motor, to find the cause will be appropriate medicine.
電機(jī)逆轉(zhuǎn)我們需要看到三相導(dǎo)線,交換它們的任意一個(gè)相序,就可以了。如果相序改變后仍有問題,那么消防泵的出口管道應(yīng)做一些放空設(shè)施,當(dāng)泵已經(jīng)開始運(yùn)行時(shí),應(yīng)調(diào)試出口閥,出口壓力應(yīng)達(dá)到一定值,這是正常的。如果達(dá)不到,就會(huì)影響消防泵的出路效應(yīng),或者導(dǎo)致水泵超壓運(yùn)行。
Motor reversal we need to see the three-phase wire, swap any of their phase sequence, can be solved. If there is still a problem after the phase sequence changes, then the outlet pipeline of the fire pump should do some venting facilities. When the pump has started to run, the outlet valve should be debutted, and the outlet pressure should reach a certain value, which is normal. If not, it will affect the fire pump outlet effect, or lead to pump overpressure operation.

下方泵也要定期進(jìn)行檢查和檢查,以保持消防系統(tǒng)的電源和電路正常,電氣設(shè)備正常。在檢查的過程中消防泵的重量應(yīng)該是均勻的并且沒有異常的聲音。那么,檢查應(yīng)該加油了。
The lower pump should also be checked and inspected regularly to keep the power supply and circuit of the fire protection system and the electrical equipment normal. The weight of the fire pump should be uniform and there should be no abnormal sound during the inspection. Well, the inspection should be refueled.
加油窗中點(diǎn)應(yīng)作為標(biāo)準(zhǔn),加油量應(yīng)與中點(diǎn)線保持平衡。有時(shí)候不可能做到準(zhǔn)確,所以稍微低于中點(diǎn)線就可以了。此外,檢查抽水時(shí)間。這些數(shù)據(jù)需要記錄下來。
The midpoint of refueling window should be taken as the standard, and the amount of refueling should be balanced with the midpoint line. Sometimes it's impossible to be accurate, so just a little below the midpoint line will do. Also, check the pumping time. This data needs to be recorded.
川消消防泵啟動(dòng)后,浮球應(yīng)處于運(yùn)行狀態(tài),排氣管中不應(yīng)有水。如果檢查,恰好發(fā)現(xiàn)有水,需要應(yīng)該更換墊圈,以確保密封體緊密,排氣正常。檢查定期,看看消防泵,各地的連接是否牢固,能否順利運(yùn)轉(zhuǎn)。
After the fire pump is started, the floating ball should be in running state, and there should be no water in the exhaust pipe. If the inspection happens to find water, the gasket should be replaced to ensure that the sealing body is tight and the exhaust is normal. Check regularly to see whether the fire pump, the connection around the firm, can run smoothly.
川消消防泵使用之前需要進(jìn)行調(diào)試工作相關(guān)內(nèi)容便是以上這樣了,如果您對該設(shè)備還有問題沒有得到有效處理的話,可以來網(wǎng)站
m.xintli.net咨詢我們!
Sichuan fire pump before the use of debugging work related content is the above, if you have a problem with the equipment has not been effectively dealt with, you can come to the website m.xintli.net consult us!